Home Login
Home Login
 
Home About Us Product Gallery Warranty Instructions Contact
 

INSTALLATION INSTRUCTIONS FOR ACME CONE COMPANY PRODUCTS
The installation of an Acme Cone Co. accessory involves procedures and techniques very much like those of any PVC or TPO manufactured product. Proper steps will insure the customer with the most reliable and virtually maintenance free system.

Successful installation of an Acme Cone Co. product must be carefully planned and implemented. A basic understanding of PVC / TPO products is a key to unnecessary problems. Both PVC / TPO accessories have different properties in their composition. Therefore each has a similar, but different installation procedure.

The basic installation procedure of an Acme Cone Co. product should follow the same recommendations as the manufacture of the field product being installed.

GENERAL REQUIREMENTS
Acme Cone Co. accessories are to be hot air welded only. This means membrane to membrane only.

All surfaces to be welded shall be clean and dry.

HOT AIR WELDING
Hand-held welding equipment is required for installing Acme Cone Co. accessories. Once the overlap area and the material starts to soften, immediately follow with a nylon hand roller to press the heated membrane surfaces together with slow, even movements. Keep the roller within one inch of the nozzle tip. Angle the hot air tool so that the flowing air faces the roller. For best results, test the seams 6-8 hours after installation.

This material was provided to help the contractor with practical information that can help ensure proper performance in the installation of any Acme Cone Co. accessory. If in doubt about a procedure, please call our toll free number at 866-516-4079.

ffff
Home  |  About Us  | Product Gallery  | Warranty |  Application Instructions   Contact
Copyright © 2008 Acmecone.com. All Rights Reserved.